초록
The economic feasibility of the energy conversion through anaerobic digestion of spoiled milk was assessed for the microscale biogas production and heating value was determined experimentally on a pilot plant with a mixture of spoiled milk and an inoculum previously optimized with Anaerobic Biomethanation Potential tests. Results shows that the feasibility of a 100 kWel plant is characterized by a quite short return time of the investment. Considering a discount rate of 5% and a timespan of investment equal to 20 years, payback period is equal to 8-9 years, Net Present Value is equal to 806,903 @? and Internal Rate of Return is equal to 16%.